403 Hollis Road - Barn Dismantling Project Update July 01, 2026

From
To
Date
  • 403_Hollis_Rd_Barn_IMG_3902_19June2026_768x1024.JPGNot posted

    The original photo is not in this public copy.

  • 403_Hollis_rd_Barn_IMG_3943_29june2026_1024x768.JPGNot posted

    The original photo is not in this public copy.

  • 403_Hollis_Rd_Barn_IMG_3954_28June2026_1024x768.JPGNot posted

    The original photo is not in this public copy.

  • 403_Hollis_Rd_Barn_IMG_3948_28July2026_1024x768.JPGNot posted

    The original photo is not in this public copy.

  • 403_Hollis_Rd_Barn_IMG_3956_29June2026_1024x768.JPGNot posted

    The original photo is not in this public copy.

  • 403_Hollis_Rd_Barn_IMG_3958_29June2026_1024x768.JPGNot posted

    The original photo is not in this public copy.

  • 403_Hollis_Rd_Barn_IMG_3960_30june2026_1024x768.JPGNot posted

    The original photo is not in this public copy.

Dear Mary Hoffman, Roger Hicks, and Select Board, Code Enforcement Officer Dwayne Hanson, CEO Admin Tammy,

I am writing to provide another update on the barn dismantling project.

I have removed some of the South (Front) exterior wall framing and sheathing around the old overhead door rough opening.(please see attached photos below).

The electrical service entrance cable/anchor eye has been relocated from a wall stud of the gable, to a new post (to meet the required height) at the West existing shed exterior wall.

I have begun removing the sheathing boards from the West roof (which are generally in good re-usable condition), and store them for reuse, possibly on a new 8x12 Shed behind (to the North of) the removed barn footprint.

Among the next steps are to dismantle the...

- rest of the West roof sheathing boards, - roof rafters - front and rear gables - second floor boards & floor structure - first floor walls, except for a section that may be adapted to serve as the West exterior wall for the existing shed, and to help brace the new electric service post. - the first floor boards, sills and floor joists

Again, I plan to send you another update in about a month.

Sincerely,

Jim Della Torre

mailto: [email protected]

In this exchange

  1. Jul 1, 2026/Jim403 Hollis Road - Barn Dismantling Project Update July 01, 2026
  2. Jul 1, 2026/[email protected]RE: 403 Hollis Road - Barn Dismantling Project Update July 01, 2026