Public record · Maine FOAA

Hollis Select Board Transparency Archive

Town of Hollis, Maine · 546 messages · Jun 1, 2026 – Aug 14, 2026

from:harnois, subject:roles, month:2026-06, or a quoted phrase. Press / to focus search.

008e01dcf6d85ed5f0001c81d000

Bar Mills headpond variance

From
To
Cc
Date
  • Read from the file

    Sent via email June 10, 2026 Mr. Jay Seyfried Senior Compliance Specialist Brookfield Renewable 150 Main Street, Lewiston, Maine, 04240 Subject: Response to May 13, 2026, Temporary Headpond Variance Request for Spillway Flashboard Removal Bar Mills Project (FERC No. 2194)

    Dear Mr. Seyfried: The Buxton and Hollis Select Boards appreciate the opportunity to review Brookfield White Pine Hydro LLC’s (BWPH) May 13, 2026, correspondence regarding the proposed temporary headpond variance request and spillway flashboard removal associated with the Bar Mills Project (FERC No. 2194). In general, the Select Boards concur with the rationale to lower the headpond elevation for the environmental and safety reasons discussed in the May 13, 2026, correspondence. However, after comparing the proposed headpond variance alongside the August 2025 Wetland, Botanical, and Shoreline Erosion Study – Bar Mills Project FERC No. P-2194 (Study) prepared by Kleinschmidt Associates, we have the following concerns. The proposal to remove the flashboards October 1, 2026, needs to align with the results of the Study. The Select Boards recommend removing the spillway flashboards in late spring to early summer of 2027. The Study determined that approximately 70% of the shoreline in the Bar Mills study area had a high Bank Erosion Hazard Index. Almost 2% of the shoreline had a very high rating. Removing the flashboards October 1 would leave the sandy riverbanks vulnerable to erosion from spring runoff or heavy rainfall for 7 to 8 months before the 2027 growing season. This timing concern is especially important because the Study noted that the vegetation re-growth on the riverbanks: is known to occur very rapidly if a drawdown occurs during the growing season, given the presence of seed banks in the sediment, water available in the riverbank, and sunlight during the growing season. The Select Boards also recommend, consistent with the Study, BWPH use the headpond variance to begin monitoring the shoreline for “invasive botanical infestations while they are still relatively easy to treat and manage.” The Study identified reed canary grass and Japanese knotweed as the two invasive plant species most likely to take hold in some portions of the exposed shoreline. The Select Boards welcome continued coordination as the headpond variance request is considered and permit applications and design plans for the decommissioning are developed over the coming months. Sincerely,

    David Field, Chairman Michael Harnois, Chair Buxton Board of Selectmen Hollis Select Board

    cc Laura Paye - Maine DEP Jim Pellerin - Maine DIFW Lars Hammer and Casey Clark - Maine DMR Cherrie Dunnig - Saco River Corridor Commission Diane Shannon - FERC FERC Online

Greetings,

I'm following up on last Tuesday's discussion about Brookfield lowering the headpond this October. Attached is a joint Buxton-Hollis letter I'm recommending the select boards send in response to Brookfield's May 13 correspondence. Once David and Michael Harnois sign the last page it can be emailed as an attachment to Jay Sefried [email protected].

If this week's elections make finalizing the letter difficult, it would be good to let Jay know the comments will be delayed until next week.

I also suggest filing the joint letter with FERC.

Please let me know what the select boards decide.

Donna, I'm available Tuesday and Wednesday this week and Tuesday and Friday of next week, if you need help.

Thank you.

Mark Woodruff

207-615-7977

In this exchange

  1. Jun 7, 2026/Mark WoodruffBar Mills headpond variance
  2. Jun 8, 2026/Daniel YarumianFwd: Bar Mills headpond variance
  3. Jun 9, 2026/Mark WoodruffFW: Bar Mills headpond variance
  4. Jun 9, 2026/Daniel YarumianFwd: Bar Mills headpond variance
  5. Jun 9, 2026/Mike HarnoisRe: Bar Mills headpond variance
  6. Jun 10, 2026/Mark WoodruffRE: Bar Mills headpond variance
  7. Jun 10, 2026/Michael HarnoisRe: Bar Mills headpond variance